Should the Taxpayer Pick Up the Tab for Site C?
Posted on
This paper argues that the net losses for Site C (whether it proceeds or is cancelled) should be covered by the taxpayer rether than expecting the ratepayers to pay the cost by increasing the cost of domestic power sold.